I'm going to see if I can't do interim goal reports. I've been somewhat productive since I posted my goals. So the first report, August 5, will be productivity in red.
My second report for August 12, will be productivity in blue :)
Time for my third report of the month, August 20. This week hasn't been quite as productive. But every thing done, is a step forward.
My second report for August 12, will be productivity in blue :)
Time for my third report of the month, August 20. This week hasn't been quite as productive. But every thing done, is a step forward.
1. Monthly blocks of the month
- Clever Chameleon Color Bear downloaded, pieces for this block have been prepped.
DONE
DONE
There are now enough bears to put two complete rows together.
Half of a quilt DONE.
I just love the "party" print I found to use as sashing.
- Quilt Doodle Doodle BOM * downloaded
- Honeybee Cloth Sweetest Things * downloaded
- Janda Bend Quilts Fall into a Quilt (x2)
Pie block - DONE
Second block has been downloaded
DONE
I have enough blocks to put a row together, but have opted not to do this one just yet.
Pie block - DONE
Second block has been downloaded
DONE
I have enough blocks to put a row together, but have opted not to do this one just yet.
- Morning Glory Designs BOM * downloaded
* some of these I'm just collecting patterns and will make at a later date.
2. Maggie's First Dance
- top needs to be sandwiched
I reserved a room at church to layout the quilt, have all my supplies packed and in the car.
And after a morning in my old Sunday School class, I have a pin-basted quilt ready for machine quilting.
I reserved a room at church to layout the quilt, have all my supplies packed and in the car.
And after a morning in my old Sunday School class, I have a pin-basted quilt ready for machine quilting.
- begin quilting
3. P&N BOM
4. Busy Bee BOM
- cut and assemble first border
5. Needle Book
6. Postcard Swap
- make
- get in the mail
DONE - I'll post pictures next update.
DONE - I'll post pictures next update.
7. Mystery project
(not to be confused with Mystery #3)
(not to be confused with Mystery #3)
- pull fabric
- cut, assemble
- get in the mail
DONE
DONE
8. Curtains
- make curtains, so Honey Do can hang rod during his vacation :)
9. Holly Cottage Christmas
- review and plan next step
10. Christmas PJs
- make at least one pair
Thanks for stopping by,
Wishing you a day filled with kindness.
Verse of the Day
He who finds a wife finds what is good and receives favour from the LORD.
Prov. 18:22 NIVUK
|
2 comments:
I was thinking maybe I'd lost my mind because I could remember commenting on that flower! LOL. Now I see that part of the post is the same because it's a report! Your pumpkins turned out great! I received your mail yesterday, too, just so you know it arrived safely. =) You are getting quite a bit done, even if it seems in bits and pieces.
A lot of projects receiving attention, and lots accomplished. Two half quilts!!! Love reading your blog Edi!
Post a Comment