Hard as I try, I can't seem to keep up with my blog these days. So, I'll post when I can and hope and pray that things settle down a bit so I can chat a little more often.
Here's what I had planned for April and how I have progressed so far:
1. Believe (link) BOM
- applique all the pieces in place
2. JoAnn's 1996 BOM
The original post said 1997, but that was incorrect.
- begin assembling blocks. Originally, without checking, I thought these had been started. That too was incorrect. I'm actually starting from scratch.
Done - blocks 1-5
3. I Love Home
- assess progress on this project - Done
Now I need to start working on this one.
The first two blocks were finished. I have one seam on block three and all of block four to assemble, then all I have left to do is assemble the top.
Now I need to start working on this one.
The first two blocks were finished. I have one seam on block three and all of block four to assemble, then all I have left to do is assemble the top.
4. Girls Getaway (link)
- continue stitching. Yes - almost finished.
Thanks for stopping by,
Wishing you a day filled with all the things that make and keep you happy.
Have mercy on me, O God, according to your unfailing love; according to your great compassion blot out my transgressions. Wash away all my iniquity and cleanse me from my sin.
Psalm 51:1-2 NIVUK